To prepare for the APICS CPIM Exam, there are various resources available including textbooks, online courses, and exam prep materials. CPIM exam itself consists of 150 multiple-choice questions and is typically completed within four hours. The passing score for each part of the exam is 300 points out of a possible 350 points. Professionals who have obtained the CPIM certification must maintain their certification through continuing education and recertification every five years to demonstrate they are staying up to date with new developments and trends in the field.
NEW QUESTION # 80
What occurs when the cost of ordering equals the cost of carrying?
- A. Ordering cost quantity
- B. Predetermined carrying cost
- C. Economic-order quantity
- D. Exact-order completeness
Answer: C
NEW QUESTION # 81
Life cycle approach for identifying order winners and qualifiers is complicated in that:
- A. Not a single requirement applies to all these of life cycle
- B. Customer needs change work frequently
- C. The duration of life cycle will be very different for different products.
- D. Life cycle phase are difficult to understand
Answer: C
NEW QUESTION # 82
Functional specification can be described by a combination of:
- A. Brand
- B. Miscellaneous
- C. All of the above
- D. Engineering drawings
Answer: C
NEW QUESTION # 83
Showing the scope of the quality management system is known as:
- A. policy
- B. procedure
- C. plan
- D. practice
Answer: A
NEW QUESTION # 84
An index of the relative priority of an order to other orders at a work center is referred to as:
- A. Schedule ratio
- B. Critical ratio
- C. Priority ratio
- D. Aspect ratio
Answer: B
NEW QUESTION # 85
An income statement of a company is as follows:
Profit has been increased by 60% to get the in profit by 600,000 by increasing revenue; sales would have to increase to 1.2 million. What will happen with CGS?
- A. Will remain same
- B. Increase by 4%
- C. Decrease by 3%
- D. Decrease by 4%
Answer: C
NEW QUESTION # 86
Master production schedule, inventory records and bills of material are three major inputs to
- A. Capacity Requirements planning (CRP)
- B. Production activity Control
- C. Material Requirements planning (MRP) System
- D. Manufacturing Planning and Control (MPC) Function
Answer: C
NEW QUESTION # 87
The material requirement plan authorizes production activity control (PAC):
- A. To take control of work orders and make sure they are completed on time
- B. All of these
- C. To manage day-to-day activity and provide the necessary support
- D. To work orders to the shop for manufacturing
Answer: B
NEW QUESTION # 88
Which of the following is NOT the dimension to quality measurements?
- A. Production
- B. Aesthetic
- C. Function
- D. Accuracy
Answer: A
NEW QUESTION # 89
The CPI system is based on the scientific methods. This general method is used to solve many kinds of problems. Which of the following is NOT the out of six steps continuous improvement process?
- A. Select the process to be studied
- B. Record the existing method to collect the necessary data in a useful form
- C. Bottlenecks
- D. Analyze the recorded data to generate alternatives improved methods
Answer: C
NEW QUESTION # 90
A work center consists of 4 machines each working a 16-hour day for 5 days a week. What is the weekly available time?
- A. 300 hours per week
- B. 320 hours per week
- C. 350 hours per week
- D. 230 hours per week
Answer: B
NEW QUESTION # 91
The following four jobs, A-D, have critical ratios of 1.6, 1.2, 0.3, and 0.4 respectively. When this rule is utilizing for dispatching, what is the sequence of job execution?
- A. C, D, B, A
- B. A, B, C, D
- C. D, C, B, A
- D. D, A, B, C
Answer: B
NEW QUESTION # 92
When the last operation is on the routing is scheduled first and is scheduled for complete at the due date, this is called:
- A. Timid scheduling
- B. Self-assistant scheduling
- C. Rearward scheduling
- D. Backward scheduling
Answer: D
NEW QUESTION # 93
Altering the load in balancing capacity available means?
- A. Shifting orders ahead or back
- B. Rescheduling of load sheet
- C. Shifting orders back
- D. Shifting orders ahead
Answer: A
NEW QUESTION # 94
A manufacturer has the alternative of making parts in-house or of buying them from an outside supplier. Reason/s to buy out may be:
- A. Uses specialized expertise of suppliers
- B. All of these
- C. Allows the firm to concentrate on its own areas of specialization
- D. Requires less capital investment
Answer: B
NEW QUESTION # 95
The capacity requirements plan occurs at the level of:
- A. MPS
- B. Both A&C
- C. MRPII
- D. MRP
Answer: D
NEW QUESTION # 96
What have most of the values clustered near a central point with progressively fewer results occurring away from the cluster?
- A. Average distribution
- B. Relevant distribution
- C. Normal distribution
- D. Frequent distribution
Answer: C
NEW QUESTION # 97
Over a period of 4 weeks, a work center produced 50, 45, 40, and standard house of work. What is the demonstrated capacity of the work center?
- A. 47.8
- B. 49.5
- C. 47.5
- D. 0
Answer: A
NEW QUESTION # 98
ISO does not provide the documentation but specifies generic requirements for management that are typically grouped into which of the following levels:
- A. scope, procedures, practice and quality
- B. policies, procedures, practice and environment
- C. plan, procedures, performance and proof
- D. policies, procedures, practice and proof
Answer: D
NEW QUESTION # 99
The quantity on hand plus the quantity ordered must equal the sum of the demand during the lead time plus the demand during the review period plus safety stock.
- A. False
- B. True
Answer: B
NEW QUESTION # 100
Where-used reports give information about
- A. Both A & B
- B. The parents for a component
- C. None of the above
- D. Independent and dependent demand
Answer: B
NEW QUESTION # 101
What is based on the participation of all members of an organization in improving processes, products, services, and the culture they work in is called:
- A. All of the above
- B. Continuous Process Management
- C. Total Quality Management
- D. Workflow Management
Answer: C
NEW QUESTION # 102
If the cost of direct material is 60%, direct labor is 10%,and overhead is 25%of sales. How much to give the same increase in profit? (Remember overhead cost is constant)
- A. 19%
- B. 17%
- C. 18%
- D. 13%
Answer: B
NEW QUESTION # 103
Which of the following is/are the major characteristic/s to flow manufacturing?
- A. All of these
- B. Work centers are dedicated to producing a limited range of similar products.
- C. Routing are fixed and work centers are arranged according to the routing.
- D. Material flows from one workstation to another.
Answer: A
NEW QUESTION # 104
The group works together to develop the product design so it meets the needs of the customer and can be made and delivered to the customer at low cost in a process called:
- A. Manufactured engineering
- B. Workgroup engineering
- C. Time-to-market engineering
- D. Concurrent engineering
Answer: D
NEW QUESTION # 105
......